Client : The Department of Roads, BhutanLocation : Over Amochu at Tabaramtey on the P’ling-Samtse highwayEstimated Cost : 250 million Nultrum
Key features:• Longest Span Bridge in Bhutan• Parabolic 3 D Tube arch, Not Parralel Arch, Cable suspension, Composit Deck• 140 m.single span +100 M. Approach
Scope of Services:Conceptual planning, design, drawings
Amochu River Bridge, Bhutan
Client : The Department of Roads, Bhutan
Location : Over Amochu at Tabaramtey on the P’ling-Samtse highway
Estimated Cost : 250 million Nultrum
Key features:
• Longest Span Bridge in Bhutan
• Parabolic 3 D Tube arch, Not Parralel Arch, Cable suspension, Composit Deck
• 140 m.single span +100 M. Approach
Scope of Services:
Conceptual planning, design, drawings