“In general, an increase in span from 90m to 130m is expected to increase the design moments and other results by about 2 times and hence the corresponding increase in construction cost and complexity. However, CPI’s Value-Engineering based redesign of 130m span, twin-deck balanced cantilever bridge within the original budget and construction time is a huge relief for all agencies involved in addition to a extraordinary proof of true value engineering, cost optimization and innovative method of construction”.